Our Projects

Botswana Ash Sua Pan
MTL Triad team has been involved with shut down & refurbishment projects on Botash plants and pipeline since early 90’s.

Successfully Completed projects include:
Steel works encompassing remediation, fabrication and installation of structural steel. Civils have also been carried out rehabilitating and refurbishing plinths, bundwalls and floors. The supply and erection of site wide scaffolding and access solutions for both maintenance and projects for all plants Corrosion protection on structural steel, boilers and other assets. Insulation cladding and sheeting on boilers and other assets.

Completed maintenance solutions Include:
Structural Steel Fabrication, propping, replacing and installation. Corrosion protection on structural steel, platework, boilers, tanks and other vessels. Site wide sheeting, Boiler insulation & Cladding. Site wide maintenance and project access solutions including Scaffolding, rope access and suspended scaffold/platform solutions. Project teams have ranged from 8 to 120 during shutdowns. MTL has proven the ability to handle massive plant wide maintenance and short intense shutdown interventions. If you are serious about structural integrity, your life of mine and avoiding catastrophic failure then MTL is your once stop solution for a full plant maintenance and refurbishment offering.

BCL & Tati Nickel
MTL Management has been actively involved in major projects on Tati and Pikwe plant since 1987. Most recently the Plant refurbishment was completed with support services to Kentz in the boiler refurb project completed in 2016

Completed maintenance solutions Include:
Corrosion protection on structural steel, platework, thickeners, tanks and other vessels. Site wide sheeting, insulation & Cladding. Concrete Rehab on Conveyer Plinths, bund walls and secondary containment structures. Concrete repair and rehabilitation of plant floors. Site wide maintenance and project access solutions including Scaffolding, rope access and suspended scaffold/platform solutions. The entire plant was scaffolded with more than 800 tons of scaffold. Significant builds included a major hanging scaffold in the boiler.

Debswana - Orapa Plant 1 & 2, Lethlakane & Damtshaa
MTL Triad team has been involved with refurbishment projects on Debswana Orapa plants Since 2011.

Successfully Completed projects include:
Steel works encompassing fabrication and installation of categories 4 and 5 site wide structural steel integrity priorities. Civils have also been carried out successfully on numerous site wide projects. The rehabilitation of Plant 1, Plant 2, DMS, Crushing, MTP, Crusher bins, 600 T Bunkers, Carp building, Silos, Flocculant plant, Degrit, Drill chip sampling plant, OM2, ultraceps, thickener refurbishment and rebuilds and the full conveyer rehabilitation & refurb including structural steel and concrete replacement. Damtshaa Thickeners refurbishment. Letlhakane Modular tailing plant corrosion protection. The supply and erection of site wide scaffolding and access solutions for both maintenance and projects for all 3 mines.

Completed maintenance solutions Include:
Structural Steel Fabrication, propping, replacing and installation. Corrosion protection on structural steel, platework, boilers, tanks and other vessels. Site wide sheeting, Boiler insulation & Cladding. Site wide maintenance and project access solutions including Scaffolding, rope access and suspended scaffold/platform solutions. Project teams have ranged from 8 to 120 during shutdowns. MTL has proven the ability to handle massive plant wide maintenance and short intense shutdown interventions. If you are serious about structural integrity, your life of mine and avoiding catastrophic failure then MTL is your once stop solution for a full plant maintenance and refurbishment offering.

Debswana Jwaneng
MTL Management has been actively involved in site management of major projects on the Jwaneng plant since 2007. Projects include 3 year Corrosion protection and maintenance site wide 2008. Supporting Fluor, Kentz, FL Schmidt, Roymec and other SMPP operators during the cut 8 project in 2010. Site Wide Corrosion protection in 2012.Site wide Corrosion Protection in 2016. Scaffold maintenance contracts in 2015, 2017 and currently completion of the 2020 contract.

Completed maintenance solutions Include:
Structural Steel Fabrication, propping, replacing and installation. This included major structural plant support beams under the screens in DMS MTP. Steel plate fabrication and replacement. Q decking remove and replace. Corrosion protection on structural steel, platework, thickeners, tanks and other vessels with the Recrush and MTP plants. Site wide sheeting, insulation & Cladding. Concrete Rehab on Conveyer Plinths, bund walls and secondary containment structures. Concrete repair and rehabilitation of plant floors. Site wide maintenance and project access solutions including Scaffolding, rope access and suspended scaffold/platform solutions. Project teams have ranged from 8 to 180 people and project durations from 3 days to 3 years. MTL has proven the ability to handle massive plant wide maintenance and short intense shutdown interventions.

Khoemancau – Previously Discovery Metals
MTL Management has been actively involved in refurb projects on the Khoemancau plant since 2007. Most recently the Plant upgrade was completed with support services provided to the SMPP SMEI in 2021 which included corrosion protection, concrete rehabilitation, rubber lining and scaffolding.

Completed maintenance solutions Include:
Corrosion protection on structural steel, platework, thickeners, tanks and other vessels. Site wide sheeting, insulation & Cladding. Concrete Rehab on Conveyer Plinths, bund walls and secondary containment structures. Concrete repair and rehabilitation of plant floors. Rubber lining. Tank Linings. Site wide maintenance and project access solutions including Scaffolding, rope access and suspended scaffold/platform solutions.

Morupule, BPC, Doosan and Murray & Roberts
MTL Management has been actively involved in major refurbishments on Morapule mine, Morapule A & B power plants. Most recently the Plant refurbishment was completed with support services to Murray & Roberts & Doosan which included insulation & Cladding for the entire Morapule A plant.

Completed maintenance solutions Include:
Corrosion protection on structural steel, platework, thickeners, tanks and other vessels. Sheeting, insulation & Cladding. Specialised turbine insulation. Site wide maintenance and project access solutions including Scaffolding, rope access and suspended scaffold/platform solutions. The entire plant was scaffolded with more than 400 tons of scaffold. Specialised glass bead and aluminum oxide blasting was conducted on the turbines for Morapule A.

Engen Francisown
MTL Management has been actively involved in major refurbishments of diesel, jet fuel and oil storage tanks for over 20 years. Most recently the Tank refurbishment was completed with support services for Engen Francistown which included scaffolding as well as specialized fuel tank linings.
Completed maintenance solutions Include:
Tank base rehabilitation and concrete rehabilitation. Steel patch repair and replacement. Scraper coat and steel remediation. Secondary containment, bund design and concrete rehabilitation. Acid lining coating bricks and specialised HDPE solutions. Access scaffolding. Specialised internal and external coatings and lining.